![]() Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.Įlectrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.Ĭommunications, Structured Cabling, Data Communications, Audio-Video Communications.Įlectronic Safety and Security, Electronic Access Control and Intrusion Detection.Įarthwork, Site Clearing, Grading, Soil Treatment.Įxterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting. Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains. Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.Įquipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.įurnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.įire Suppression, Instrumentation and Control for Fire-Suppression Systems. Openings, Doors and Frames, Entrances and Storefronts, Windows.įinishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting. Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers. Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry. Inquiries should be directed to the contact(s) listed.Ĭoncrete, Concrete Forming, Cast-in-Place Concrete. The content management team continues to pursue additional details however, the contact(s) listed have yet to disclose or confirm any information. A firm timeline has not been established, however construction is unlikely to begin prior to third quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. ![]() An architect has been selected, however, information regarding the selection of a general contractor has not yet been determined. ![]() No further plans or applications have been submitted for review at this time. New Construction, Infrastructure - 150,400 SFĭemolition, New Construction, Infrastructureĭemolition, New Construction, Infrastructure, Renovation - 373,765 SFĪs of January 2023, the project is in the early planning stages, and received design review approval from the City of Monrovia. LEED Certification, New Construction, Infrastructure - 122,400 SF New Construction, Infrastructure - 511,604 SF Demolition, New Construction, Renovation, Infrastructure ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |